30 September 2019
The U.S. 31 bridge that spans the Grand River in Grand Haven, Michigan recently underwent a major rehabilitation, including new mechanical and electrical components. The bridge is one of the busiest in the state with more than 60,000 vehicle crossings on an average day, and 120,000 crossings during summer holiday weekends.
Read More
16 November 2017
A major U.S. cement manufacturer needed to replace the drivetrain components on a large limestone bridge reclaimer at one of its facilities.
14 August 2014
A leading marine and industrial powertrain manufacturer required a clutch solution for a new remote PTO assembly for diesel engines. Most marine and industrial transmissions have one or more PTO locations which only utilize a fraction of the transmission’s capacity within limited space restrictions.
Browse News Archives
Browse News Categories
UpComing Tradeshows
February 07-09, 2023 MD and M West 2023 Anaheim, CA
October 18-20, 2023 Equip Expo 2023 Louisville, KY
November 10-13, 2023 NAEC 2023 Reno, NV
2023 © Altra Industrial Motion Corp. ALL Rights Reserved. Legal, Privacy Policy | SiteMap